Skip to main content

SWMS - Safe Work Method Statement

EmployersA orsafe businesses,work ormethod anyonestatement who(SWMS) fallsis a safety planning document that must be developed for work that is considered high risk construction work under the definitionWork ofHealth aand ‘person conducting a business or undertaking’Safety (aWHS) PCBU),Regulation has2017.

legal

A obligationsSWMS undermust workbe healthsite-specific and made available to workers, supervisors and any other persons at the workplace, so they can understand the hazards, risks and safety laws.

controls
that
    must
  1. identifybe hazards in the workplace
  2. assess the risk those hazards create
  3. then eliminate or minimise them as much as possible.

An employer and/or PCBU has a legal duty eliminate or minimise risksused to healthkeep workers and safetyothers of workers at work in their business or undertaking.

The person with management or control of a workplace also has a legal duty to make sure, so far as is reasonably practicable, that there are no health and safety risks to anyone working in or visiting the workplace. This includes when people are entering or exiting the workplace. It generally does not include residences, unless the residence is occupied for the purpose of conducting a business.safe.

A workplaceSWMS canis includeintended to be a vehicle,simple vessel,safe aircraft,system mobileplanning structureand orimplementation anytool, installationused by supervisors and workers to stay safe on waterconstruction thatsites awhen workerundertaking mighthigh berisk at while atconstruction work.

Read more at the SafeWork NSW website - click here

A list of templates and relevant documents can be found under "Attachments" on the side of this page.